We are working on all three categories, the area measurement rule are same for all i;e 1KW needs a shadow free 100-120 sqft or 10 sqmt area. We are capable to handle the KW to MW scale projects weather the project is CAPEX or OPEX /RESCO model.

Trouble-free ladder to convert your Grid Power into Solar Power

  • Site Evaluation: First will be checking the roof’s orientation (azimuth) and solar access. Orientation refers to the direction the roof faces – directly south is ideal, with some leeway to the Southwest or Southeast. On the roof the load bearing is very important factor of any project, for the ground mount project soil conditions are important factor.
  • Installation & Commissioning: Once we get the clearance from the site assessment then we are ready to move on the second step for design the finest arrangement of world class efficient products.
  • Connect with DISCOMS: Our next step to tie with DISCOMS for the PPA sign agreements, If we not do this job, then the current produced by solar power can disturb the existing system from the solar power or if we are not comfortable form the Net Metering system then we have the options for Captive Solar power plant too.
  • Maintenance: The integral part of any completed installation is the periodic checks that are recommended for any stand-alone PV system so that little problems can be found and corrected before they affect system operation. The system should be checked soon after installation when it is presumably operating well.